Tunnel Borik
Western portal of the tunnel, December 2006 Western portal of the tunnel, August 2006
Western portal of the tunnel. Western portal of the tunnel.
Eastern portal of the tunnel, December 2008 Eastern portal of the tunnel, December 2008
Eastern portal of the tunnel. Eastern portal of the tunnel.

The tunnel Borik is part of the highway D1 Mengusovce - Janovce. The tunnel has been constructed from environmental reasons. There will be two parallel tubes with the total length 999 and 993 meters, which both decrease in slope by approx. 1 % between the west and the east portals. In each tunnel tube will be two lanes with a total carriageway width of 7.5 m. The tunnel will be driven using the principles of the New Austrian Tunneling Method. The tunnel was opened to traffic on 4th December 2009.